Build Your ADU in Fairfax County, VA

Makara ADU designs, permits and builds accessory dwelling units to Fairfax County’s rules, and builds nothing else.

ADU max size
Detached: 1,200 sq ft · Attached: lesser of 800 sq ft or 40% of the main house
Minimum lot size
No minimum
Detached unit lot minimum
87,120 sq ft
Owner occupancy
Required
Off-street parking
Three spaces total on a public street · four on a private street
Allowed by
Right, in permitted zones
  • Licensed & Insured in Virginia (Class A 2705184565)
  • Fairfax County ADU Specialists
  • Full-Service: Design → Permits → Build
  • Free Property Eligibility Assessment
Assessment

Can you build an ADU in Fairfax County, VA?

Yes. Fairfax County allows an accessory living unit inside or attached to your house on an administrative permit, capped at 800 square feet or 40% of the house, whichever is less. A detached unit can be up to 1,200 square feet, but needs a lot of at least two acres and a special permit approved at a public hearing. Either the house or the unit must be owner-occupied, and the unit is limited to two bedrooms and two occupants.
Know the Rules

Fairfax County ADU Guidelines

The rules that decide whether, and what, you can build. The table below carries the specifics.

Size Limits

Detached: 1,200 sq ft

1,200 sq ft · lot of at least 2 acres · Board of Zoning Appeals special permit · 800 sq ft or 40% of the principal dwelling, whichever is less · administrative permit

Zoning & Eligibility

Permitted by right

All residential zones. No minimum lot size.

Setbacks

Where the unit can sit

Front: 35 ft · Side: 10 ft · Rear: 10 ft

Parking

Off-street spaces

Three spaces total on a public street · four on a private street

Occupancy

Owner must live on site

Maximum two bedrooms and two occupants in the unit

Permits & Source

Governing ordinance

Fairfax County Zoning Ordinance §4102.7 (zMOD) — Accessory Living Units

Not sure?

Check Your Address

Run our free eligibility check and get Fairfax County’s rules applied to your exact lot in about a minute.

Check my property →
Fairfax County ADU requirements at a glance
RequirementFairfax County standard
Allowed byRight, in permitted zones
Minimum lot sizeNo minimum
Minimum lot size (detached)87,120 sq ft (about 2 acres)
Permitted zonesAll residential zones
Maximum sizeDetached: 1,200 sq ft · Attached: lesser of 800 sq ft or 40% of the main house
Detached maximum1,200 sq ft · lot of at least 2 acres · Board of Zoning Appeals special permit
Attached maximum800 sq ft or 40% of the principal dwelling, whichever is less · administrative permit
SetbacksFront: 35 ft · Side: 10 ft · Rear: 10 ft
ParkingThree spaces total on a public street · four on a private street
Owner occupancyRequired
Garage or basement conversionAllowed
Who may live thereMaximum two bedrooms and two occupants in the unit
OrdinanceFairfax County Zoning Ordinance §4102.7 (zMOD) — Accessory Living Units
Rules current as of2023-01-01

If your plan is a unit for a parent, an adult child or other family member, and your lot is under two acres, the practical route in Fairfax today is to add the ADU inside the house, or as an addition to the house. A basement conversion, a bedroom wing, or an addition can all qualify, and those are approved administratively. Makara ADU will work with you to design and build the perfect fit for your family and your property.

How It Works

The Fairfax County ADU Permit Process

Makara ADU handles this entire process from design to move-in, full turn-key.

  1. 01

    Zoning & Eligibility

    Confirm the lot area and whether you are pursuing an interior, attached or detached unit; a detached unit needs two acres. Makara ADU does this free with our property eligibility checker.

  2. 02

    Design & Drawings

    Architectural and structural plans to the county's residential code, sized to 800 square feet or 40% of the house for an interior or attached unit, or up to 1,200 square feet for a detached one.

  3. 03

    ADU Permit (County)

    File the administrative permit for an interior or attached unit, or the special permit and Board of Zoning Appeals hearing for a detached one. Makara ADU handles this for its clients.

  4. 04

    Building Permits & Build

    Building and trades permits from the county; construction proceeds with county inspections along the way.

  5. 05

    Final Inspection & Occupancy

    The county's final inspection and occupancy approval, then keys in hand, ready to occupy or rent.

Makara ADU
Why Makara ADU

Fairfax County’s ADU Specialists

We don't build everything. We build ADUs. Based in Gaithersburg, we work with local permitting offices every week and know how each jurisdiction's rules shape what can be built.

01 — EXPERTISE

Local Rules, Known Cold

Every jurisdiction we serve has its own size limits, setbacks, parking and occupancy rules. We track them, and the eligibility checker on this page runs on that same data.

02 — TURNKEY

One Contractor, Start to Finish

Architecture, engineering, permits, foundation, framing, MEP, sprinklers, finishes, and the rental license — Makara ADU manages everything under one contract. No coordinating separate architects, engineers, and builders.

03 — TRANSPARENCY

Fixed-Price Proposals

We quote your project in full before a shovel goes in the ground. No surprise change orders mid-construction — we plan for lot coverage, stormwater, and utility connections up front.

04 — PURPOSE

Built for Aging in Place & Family

Most of our Fairfax County clients build to keep aging parents or adult children close. We design single-floor, accessible units that work beautifully today and adapt gracefully over time.

What We Build

ADU Types We Build in Fairfax County

Most jurisdictions allow more than one ADU configuration. We help you choose the right one for your lot, your zone and your goals.

Most Requested

Detached Backyard Cottage

A fully independent structure in your backyard with its own entrance, kitchen and bath. The most flexible option, and the one most people picture. Size and placement follow the rules in the table above.

Most Customized

Attached Second Home

Add an attached ADU with its own separate entrance, kitchen, and bath. Makara ADU will collaborate with you to design the space to be functional to meet your needs while creating an aesthetically pleasing space that will add value to your life, family and your home.

Most Affordable

Basement and Garage Conversions

Convert an existing garage or basement into a legal, licensed ADU — the most cost-effective path to added living space, and often faster to permit than new construction.

Our Work

ADUs We’ve Built Recently

A sample of ADUs we’ve built across Northern Virginia.

Makara 340 II ADU Featured ImageMakara 340 ADU Exterior Shot 1Makara 380 ADU Featured ImageMakara 520 ADU Exterior Shot 4Open-concept ADU kitchen and living room with gray cabinets, stainless steel appliances, a round dining table with chairs, and cozy seating. Large windows and skylights fill this tiny home with natural light; wood flooring throughout.A charming tiny home with a black metal roof, double glass doors, and a basketball hoop on the concrete driveway. The yard features lush grass, mature trees, and a wooden fence along the left side.
Common Questions

Fairfax County ADU FAQ

Is there a minimum lot size for an ADU in Fairfax County?

Not for a unit inside or attached to your house. There is for a detached one: the lot must be at least two acres, which is 87,120 square feet.

How big can an accessory living unit be in Fairfax County?

A detached unit may be up to 1,200 square feet. An interior or attached unit is capped at 800 square feet or 40% of the gross floor area of the house, whichever is less.

Can I rent out an accessory living unit in Fairfax County?

You can let the unit, but either the unit or the main house must be owner-occupied, so you cannot move out and let both. Occupancy of the unit is limited to two people.

Do I need extra parking?

Yes. A property with an accessory living unit needs three parking spaces in total if it is on a public street, or four if it is on a private street.

How long does approval take?

An administrative permit for an interior unit is the faster route and does not require a hearing. A detached unit needs a special permit from the Board of Zoning Appeals, which adds a public hearing and takes considerably longer.

Are the rules likely to change?

Possibly, in the near future. Fairfax County is considering a Zoning Ordinance amendment for accessory living units that would simplify the process and could ease the current rules, including the two-acre minimum for a detached unit. Public hearings are scheduled before the Planning Commission on October 29, 2026 and the Board of Supervisors on November 17, 2026. Until the Board acts, the rules on this page are the ones in force, and we will update it if they change.

Free Assessment

Is Your Fairfax County Property Eligible for an ADU?

Use our free eligibility checker to find out in about a minute, and get a personalized report sent to your inbox.