Makara Adu Logo
Arlington County’s ADU builder

Build Your ADU in Arlington County, VA

Makara ADU designs, permits and builds accessory dwelling units to Arlington County’s rules, and builds nothing else.

ADU max size
Detached: max footprint 560 sq ft in R-5 and R-6, 650 sq ft in all other zones · ADU floor area up to 35% of the main house, max 750 sq ft (45%, max 500 sq ft, if the main house is under 1,000 sq ft)
Minimum lot size
5,000 sq ft
Owner occupancy
Required
Off-street parking
One off-street space where the property already has parking · waived if a county parking study shows the block below 65% capacity
Allowed by
Right
Rules current as of
2026-01-01
  • Licensed & Insured in Virginia (Class A 2705184565)
  • Arlington County ADU Specialists
  • Full-Service: Design → Permits → Build
  • Free Property Eligibility Assessment
Assessment

Can you build an ADU in Arlington County, Virginia?

Yes. Arlington County allows one accessory dwelling unit (ADU) per residential lot across all R zoning districts, whether attached to or detached from the main home. A detached ADU can be up to 750 sq ft (or 35% of the combined floor area, whichever is less), must sit at least 8 feet from the main house, and stay within 1.5 stories or 25 feet in height. The max footprint of the ADU is 560 sq ft in the R-5 and R-6 zones and 650 sq ft in all others. The owner must live in either the main home or the ADU. Makara ADU designs, permits, and builds the entire project — move-in ready in as little as 120 days from permit approval.
Know the Rules

Arlington County ADU Guidelines

The rules that decide whether, and what, you can build. The table below carries the specifics.

Size Limits

Up to 750 Sq Ft

ADUs cannot exceed 750 sq ft or 35% of the combined floor area of the main home and ADU — whichever is smaller. If the main home is under 1,000 sq ft, the cap is 45% up to 500 sq ft. Attached interior ADUs follow the same size formula.

Zoning & Eligibility

All Residential R Zones

ADUs are permitted by-right in all Arlington residential zones: R-20, R-10, R-8, R-6, R-5, R-10T, R-15-30T, and R2-7. Only one ADU is allowed per property, and it cannot coexist with an existing family or caregiver suite on the same lot.

Setbacks

5 ft Side & Rear

Detached ADUs on interior lots must maintain at least 5 feet from side and rear property lines. On corner lots, the rear yard setback increases to 10 feet. The ADU must also be at least 8 feet from the main dwelling and no closer than 25 feet to any street.

Footprint by Zone

560 or 650 Sq Ft

The maximum detached ADU footprint depends on your zoning district: 560 sq ft in R-5 and R-6 zones; 650 sq ft in R-20, R-10, R-8, R-10T, R-15-30T, and R2-7 zones. Height is capped at 1.5 stories or 25 feet, whichever is less.

Owner Occupancy

Required by County

The property owner must live in either the primary home or the ADU as their principal residence. Rentals are permitted for terms of 30 days or more — short-term rentals (e.g., Airbnb) are not allowed on a property with an ADU. The ADU cannot be sold separately from the main home.

Permits & Design

Administrative Approval

ADUs in Arlington require a full building permit plus any applicable trades permits (electrical, plumbing, mechanical). Design review ensures the unit is compatible with neighborhood character. Makara ADU manages the entire application process on your behalf.

Not sure?

Check Your Address

Run our free eligibility check and get Arlington County’s rules applied to your exact lot in about a minute.

Check my property →
Arlington County ADU Requirements at a Glance
RequirementArlington County Standard
Maximum ADU size35% of combined floor area, up to 750 sq ft (45% up to 500 sq ft if main dwelling is under 1,000 sq ft)
Detached footprint — R-5 / R-6 zones560 sq ft maximum
Detached footprint — other R districts650 sq ft maximum
Units allowed per lotOne ADU per residential property
Eligible zonesAll residential R zones (R-20, R-10, R-8, R-6, R-5, R-10T, R-15-30T, R2-7)
Side & rear setback (interior lots)5 ft minimum (10 ft rear on corner lots)
Separation from main dwelling8 ft minimum
Maximum height1.5 stories / 25 ft, whichever is less
Owner occupancyRequired — owner must occupy main home or ADU (under SB 531, from July 1, 2027, verified only at the time of application)
Rental rulesLeases of 30+ days permitted; short-term rentals (e.g. Airbnb) not allowed; ADU cannot be sold separately
Approval typeFull building permit plus trades permits (electrical, plumbing, mechanical)
Typical build timeMove-in ready in as little as 120 days from permit approval
Arlington AD Permit at a Glance
ItemArlington Standard (Zoning Ordinance §12.9.2)
What it isAn Accessory Dwelling (AD) Permit issued by the Arlington Zoning Division, required in addition to a Residential Building Permit
SequenceThe AD Permit comes first — the building permit can't be issued until the AD Permit is issued and the covenant is recorded
Eligible lotsOne-family detached homes in the R-20, R-10, R-8, R-6, R-5, R-10T, R-15-30T, or R-2-7 districts; one AD per lot, with no existing AD or family/caregiver suite
Owner occupancyThe owner must occupy the main home or the AD as a primary residence; a Declaration of Covenants is recorded before the building permit issues
Occupancy limitNo more than three persons
What you submitFloor plans of the main dwelling and AD, a scaled site plan, a certified plat, the covenant, and an acknowledgement of AD conditions
Pre-submission meetingRecommended with the Zoning Division (zoningadmin@arlingtonva.us) before drawing plans
AD Permit review timeAbout 30 days after the application is accepted as complete by the Zoning Division
After constructionAn Affidavit of Compliance is filed and a Certificate of Occupancy issued; the Zoning Administrator may inspect annually for ongoing compliance

Source: Arlington County Zoning Ordinance §12.9.2 and the county's Accessory Dwelling Permit program. Makara ADU manages the full process; confirm current requirements and fees with the Arlington Zoning Division before finalizing.

How It Works

The Arlington County ADU Permit Process

Makara ADU handles this entire process from design to move-in, full turn-key.

  1. 01

    Zoning & Eligibility

    Confirm your zone, lot size, footprint and lot-coverage limits, and setbacks. Determine what floorplan meets your needs best. Makara ADU handles the entire process.

  2. 02

    Design & Drawings

    Floor plans of the main dwelling and the accessory dwelling, a scaled site plan, and a certified plat — prepared to §12.9.2 and building-code standards.

  3. 03

    AD Permit (Zoning)

    File the Accessory Dwelling Permit application with Zoning. It takes about 30 days to be accepted. After acceptance, the Zoning Administrator issues it and the Declaration of Covenants is recorded with the Circuit Court. Makara ADU handles all of this for its clients.

  4. 04

    Building Permit (ISD)

    Apply for the Residential Building and trades permits with Inspection Services. The building permit can't be issued until the AD Permit is issued and the covenant is recorded.

  5. 05

    Build & Certificate

    Construction, county inspections, the Affidavit of Compliance, and the Certificate of Occupancy — keys in hand, ready to occupy or rent.

Makara ADU
Why Makara ADU

Arlington County’s ADU Specialists

We don't build everything. We build ADUs. Based in Gaithersburg, we work with local permitting offices every week and know how each jurisdiction's rules shape what can be built.

01 — EXPERTISE

Deep Arlington Knowledge

We know Arlington's zone-by-zone footprint limits, the 5-foot setback rules, and the county's design compatibility expectations inside and out. Our familiarity with the permitting office means fewer revision cycles and faster approvals.

02 — TURNKEY

One Contractor, Start to Finish

Architecture, engineering, permits, foundation, framing, MEP, sprinklers, finishes, and the rental license — Makara ADU manages everything under one contract. No coordinating separate architects, engineers, and builders.

03 — TRANSPARENCY

Fixed-Price Proposals

We quote your project in full before a shovel goes in the ground. No surprise change orders mid-construction — we plan for lot coverage, stormwater, and utility connections up front.

04 — PURPOSE

Built for Aging in Place & Family

Most of our Arlington County clients build to keep aging parents or adult children close. We design single-floor, accessible units that work beautifully today and adapt gracefully over time.

What We Build

ADU Types We Build in Arlington County

Most jurisdictions allow more than one ADU configuration. We help you choose the right one for your lot, your zone and your goals.

Most Requested

Detached Backyard Cottage

A fully independent structure in your backyard with its own entrance, kitchen and bath. The most flexible option, and the one most people picture. Size and placement follow the rules in the table above.

Most Customized

Attached Second Home

Add an attached ADU with its own separate entrance, kitchen, and bath. Makara ADU will collaborate with you to design the space to be functional to meet your needs while creating an aesthetically pleasing space that will add value to your life, family and your home.

Most Affordable

Basement and Garage Conversions

Convert an existing garage or basement into a legal, licensed ADU — the most cost-effective path to added living space, and often faster to permit than new construction.

Our Work

ADUs We’ve Built Recently

A sample of ADUs we’ve built across Arlington County.

Makara 340 ADU Exterior Shot 1Makara 380 ADU Featured ImageMakara 520 ADU Exterior Shot 4Open-concept ADU kitchen and living room with gray cabinets, stainless steel appliances, a round dining table with chairs, and cozy seating. Large windows and skylights fill this tiny home with natural light; wood flooring throughout.A charming tiny home with a black metal roof, double glass doors, and a basketball hoop on the concrete driveway. The yard features lush grass, mature trees, and a wooden fence along the left side.A charming white house with two dormer windows, black trim, a glass front door, and a small front garden with colorful flowers and shrubs. A black chair sits on the left side of the porch.
Common Questions

Arlington County ADU FAQ

Can I build an ADU in Arlington County, Virginia?

Yes. Arlington County permits one accessory dwelling per residential lot in all R zoning districts, either attached to or detached from the main home. The property owner must occupy either the main dwelling or the ADU as their primary residence.

How big can an ADU be in Arlington County?

An Arlington ADU is limited to 35% of the combined floor area of the main home and the ADU, up to a maximum of 750 sq ft (or 45% up to 500 sq ft when the main dwelling is under 1,000 sq ft). New detached units are also footprint-capped at 560 sq ft in R-5 and R-6 zones and 650 sq ft in other R districts.

Are detached ADUs and backyard cottages allowed in Arlington?

Yes. Detached ADUs are allowed in Arlington's residential zones. A detached unit must sit at least 8 feet from the main dwelling, meet a 5-foot side and rear setback on interior lots, and stay within 1.5 stories or 25 feet in height.

Do I have to live on the property to have an ADU in Arlington?

Yes. Arlington currently requires owner-occupancy — the owner must live in either the main home or the ADU as their principal residence, recorded as a covenant. Under Virginia SB 531, effective July 1, 2027, a locality may require owner-occupancy only at the time of application, not on an ongoing basis.

Can I rent out my Arlington ADU or use it for Airbnb?

You can rent an Arlington ADU on leases of 30 days or longer. Short-term rentals such as Airbnb are not permitted on a property that has an ADU, and the ADU cannot be sold separately from the main house.

How long does it take to build an ADU in Arlington?

A Makara ADU can be move-in ready in as little as 120 days from permit approval . The full timeline — eligibility review, design and engineering, and county permitting — depends on Arlington review times and project scope.

Will Virginia's new ADU law (SB 531) change the rules in Arlington?

Virginia SB 531 requires localities to allow ADUs by-right in single-family zones beginning July 1, 2027, and caps ADU permit fees at $500. Arlington already allows accessory dwellings today through its AD Permit process, so homeowners can build now; SB 531 adds a statewide floor — including the $500 fee cap, no special-use-permit requirement, and no family-relation rule — beginning July 1, 2027.

Free Assessment

Is Your Arlington County Property Eligible for an ADU?

Use our free eligibility checker to find out in about a minute, and get a personalized report sent to your inbox.