Makara Adu Logo
Montgomery County’s ADU builder

Build Your ADU in Montgomery County, MD

Makara ADU designs, permits and builds accessory dwelling units to Montgomery County’s rules, and builds nothing else.

ADU max size
Up to 75% of the size of the primary house (ZTA 26-06)
Minimum lot size
No minimum
Owner occupancy
Required
Off-street parking
One on-site space, waived within 1 mile of Metro, Purple Line or MARC (ZTA 26-06)
Allowed by
Right, in all single-family residential zones
Rules current as of
2026-10-05
  • Licensed & Insured in Maryland (MHIC 151479)
  • Montgomery County ADU Specialists
  • Full-Service: Design → Permits → Build
  • Free Property Eligibility Assessment
Assessment

Can you build an ADU in Montgomery County, MD?

Yes. Montgomery County allows one accessory dwelling unit (ADU) per lot on residential zoned properties with a single-family detached home. The ADU can be detached, attached, or in a basement or garage conversion. A DHCA-issued Class 3 license is required and the owner must occupy the main home or the ADU. The county recently approved ZTA 26-06 (the county's update to comply with Maryland HB 1466), which takes effect on or around October 1, 2026. This new rule allows the ADU to be up to 75% of the size of the primary home, a major increase from what it previously allowed. In addition, ADUs are now allowed in all residential zones, the setbacks for detached ADUs are now set to standard accessory-structure setbacks, and parking requirements are reduced. Makara ADU handles everything turn-key, including the design, permits, and construction, with move-in ready in as little as 120 days from permit approval.
Know the Rules

Montgomery County ADU Guidelines

Montgomery County allows ADUs by-right in all single family zoned properties. Here are the guidelines that homeowners need to know.

Size Limits

Up to 75% of Your Home

ZTA 26-06 replaces the county's old size caps with a single state standard: an ADU — attached or detached — may be no greater than 75% of the size of the primary home.

Zoning & Eligibility

Single-Family Lots Countywide

One ADU is permitted per lot on properties with a single-family detached home. ZTA 26-06 expands the zones where ADUs are allowed as a limited use so the county complies with state law, and excludes ADUs from density calculations in all zones.

Setbacks (ZTA 26-06)

Accessory-Structure Setbacks

Effective October 1, 2026, the minimum setback for a detached ADU will now be the same side and rear setbacks of an accessory structure in that zone. You can review the setback rules in the county here.

Parking (ZTA 26-06)

Requirements Reduced

ZTA 26-06 reduces ADU parking mandates to comply with state law. Under the prior rule, one extra off-street space was required — waived within one mile of a Metro, Purple Line, or MARC station. Confirm the current requirement for your specific address with DPS.

Occupancy & License

Live On-Site + DHCA License

The owner must occupy either the main home or the ADU as a primary residence. A Class 3 license for the ADU from the Department of Housing & Community Affairs (DHCA) is required before the ADU is approved in the county. Makara ADU handles this Class 3 application for all of its clients.

Permits & Safety

DPS Permit + Sprinklers

Once the Class 3 license is conditionally approved, the building permit is approved through the Department of Permitting Services (DPS). All construction must follow residential codes. Newly built detached ADUs, and certain additions with ADUs, require fire sprinklers. Properties in a historic district need a Historic Area Work Permit (HAWP).

Not sure?

Check Your Address

Run our free eligibility check and get Montgomery County’s rules applied to your exact lot in about a minute.

Check my property →
Montgomery County ADU Requirements at a Glance
RequirementMontgomery County Standard (Code §59.3.3.3.A, as amended by ZTA 26-06)
Units allowed per lotOne ADU per lot with a single-family detached home
ADU max size (attached or detached)No greater than 75% of the size of the primary home
Eligible zonesSingle-family detached residential lots; zones expanded under ZTA 26-06 to comply with state law
Detached ADU setbacksSame side & rear setbacks as a standard accessory structure
Density calculationADU excluded from density calculations in all zones (ZTA 26-06)
Off-street parkingReduced under ZTA 26-06; prior rule required one extra space, waived within 1 mile of Metro / Purple Line / MARC
Owner occupancyRequired — owner must occupy the main home or the ADU
DHCA license (Class 3)Required whether the ADU is rented or not — the Class 3 application and DHCA's preliminary inspection come before construction, and the license issues after a final inspection
Occupancy limitNo more than two adult occupants
Fire sprinklersGenerally required for new detached ADUs
Historic districtsHistoric Area Work Permit (HAWP) and design review required
Approval pathBuilding permit + trades permits through the Department of Permitting Services (DPS)
New rules effectiveZTA 26-06 expected on or around October 1, 2026 (Maryland HB 1466 deadline)
Typical build timeMove-in ready in as little as 120 days from permit approval

Regulations summarized from Montgomery Planning, Montgomery County Code §59.3.3.3.A, and Zoning Text Amendment (ZTA) 26-06 implementing Maryland HB 1466 / SB 891. Confirm current requirements with Montgomery County DPS before finalizing your project.

ADU Setbacks by Zone in Montgomery County

A detached ADU follows the accessory-structure setbacks for its zone — the same minimum side and rear setbacks that apply to a shed, detached garage, or other accessory building. The table below shows the standard interior side and rear minimums for the residential detached zones where most Montgomery County ADUs are built. Corner lots, older recorded lots, taller structures, and the cumulative accessory-building footprint rule can change what applies, so confirm your specific lot with DPS.

Detached ADU & Accessory-Structure Minimum Setbacks by Zone
ZoneMin. side setback (interior)Min. rear setback (interior)
RE-2, RE-2C, RE-115 ft10 ft
R-20012 ft7 ft
R-905 ft5 ft
R-605 ft5 ft
R-405 ft5 ft

Side and rear minimums are the accessory-structure setbacks from Montgomery Planning's development-standards zoning fact sheets.

Towns in Montgomery County

Municipalities That Follow Montgomery County’s ADU Rules

The following jurisdictions have their own permit process in addition to the county process; however, their ADU rules follow the same guidelines as the county.

  • Barnesville
  • Brookeville
  • Chevy Chase Section 3
  • Chevy Chase Section 5
  • Chevy Chase View
  • Chevy Chase Village
  • Friendship Heights
  • Garrett Park
  • Glen Echo
  • Kensington
  • Laytonsville
  • Martin's Additions
  • North Chevy Chase
  • Poolesville
  • Somerset
  • Takoma Park
  • Town of Chevy Chase
  • Washington Grove
How It Works

The Montgomery County ADU Permit Process

Makara ADU handles this entire process from design to move-in, full turn-key.

  1. 01

    Zoning & Eligibility

    Confirm your zone, lot size, footprint and lot-coverage limits, and setbacks under ZTA 26-06. Makara ADU does this free with our property eligibility checker.

  2. 02

    Design & Drawings

    Architectural and structural plans to Montgomery County code — fire-sprinkler design and, where applicable, a Historic Area Work Permit (HAWP) — plus the ADU and driveway drawings the Class 3 application requires.

  3. 03

    Class 3 Application (DHCA)

    File the application with proof of residency, drawings, and fees. DHCA accepts it, the public-notice sign goes up, and an initial inspection leads to the Director's preliminary report — construction can't start until it's complete.

  4. 04

    DPS Permits & Build

    Building and trades permits from the Department of Permitting Services; construction proceeds after the preliminary report, with county inspections along the way.

  5. 05

    Final Inspection & License

    DPS and DHCA final inspections and the Director's final report; the Class 3 license is approved about 30 days later — keys in hand, ready to occupy or rent.

Makara ADU
Why Makara ADU

Montgomery County’s ADU Specialists

We don't build everything. We build ADUs. Based in Gaithersburg, we work with local permitting offices every week and know how each jurisdiction's rules shape what can be built.

01 — EXPERTISE

Deep Montgomery County Knowledge

Headquartered in Gaithersburg, we work with the Department of Permitting Services every week. We know the DHCA rental-license process, sprinkler and lot-coverage rules, and exactly how ZTA 26-06 changes setbacks, parking, and eligible zones.

02 — TURNKEY

One Contractor, Start to Finish

Architecture, engineering, permits, foundation, framing, MEP, sprinklers, finishes, and the rental license — Makara ADU manages everything under one contract. No coordinating separate architects, engineers, and builders.

03 — TRANSPARENCY

Fixed-Price Proposals

We quote your project in full before a shovel goes in the ground. No surprise change orders mid-construction — we plan for lot coverage, stormwater, and utility connections up front.

04 — PURPOSE

Built for Aging in Place & Family

Most of our Montgomery County clients build to keep aging parents or adult children close. We design single-floor, accessible units that work beautifully today and adapt gracefully over time.

What We Build

ADU Types We Build in Montgomery County

Most jurisdictions allow more than one ADU configuration. We help you choose the right one for your lot, your zone and your goals.

Most Requested

Detached Backyard Cottage

A fully independent structure in your backyard. Under ZTA 26-06 a detached ADU can be up to 75% of your home's size, and its new accessory-structure setbacks mean it fits on more lots than before. Ideal for aging parents, adult children, or rental income.

Most Customized

Attached Second Home

Add an attached ADU with its own separate entrance, kitchen, and bath. The ADU can be up to 75% of the primary home's size. Makara ADU will collaborate with you to design the space to be functional to meet your needs while creating an aesthetically pleasing space that will add value to your life, family and your home.

Most Affordable

Basement and Garage Conversions

Convert an existing garage or basement into a legal, licensed ADU — the most cost-effective path to added living space, and often faster to permit than new construction.

Service Area

Serving All of Montgomery County

We design, permit, and build ADUs throughout Montgomery County, from the Beltway communities to the upcounty. A sample of the areas we serve:

Bethesda and Silver Spring see the most ADU activity in the county — explore our dedicated area guides:

ADUs in BethesdaGuide coming soon

Larger lots and the 75% rule make Bethesda one of the county's best ADU markets.

ADUs in Silver SpringGuide coming soon

Transit-close, with the parking waiver near Metro, Purple Line & MARC.

  • Silver Spring
  • Bethesda
  • Rockville
  • Gaithersburg
  • Chevy Chase
  • Kensington
  • Takoma Park
  • Wheaton
  • North Bethesda
  • Potomac
  • Olney
  • Germantown
Our Work

ADUs We’ve Built Recently

A sample of ADUs we’ve built across Montgomery County.

Single-story ADU with light beige siding, large glass sliding doors, a small wooden deck, and a grassy yard. Leafless trees and neighboring houses are visible in the background under a clear blue sky.A modern white house with a dark roof, black window frames, and a glass front door. A curved stone pathway lined with yellow flowers leads to the entrance. The yard has bushes and trees under a bright blue sky.Makara 480 ADU Featured ImageMakara 390 - ADU Interior Shot 2Single-story house with light gray siding, white trim, and large windows. A path bordered by plants leads to the front door. Surrounded by trees with autumn foliage, this home also features a garage conversion under a blue sky.A modern sunroom with large windows and skylights extends from a brick house, designed as an inviting In-Law Suite. Its surrounded by green lawn, colorful flowers, and trees under a blue sky.
Common Questions

Montgomery County ADU FAQ

Can I build an ADU in Montgomery County, MD?

Yes. Montgomery County permits one ADU per lot on properties with a single-family detached home, either attached (a basement or addition) or detached. ADUs are approved through the Department of Permitting Services (DPS), and a DHCA rental license is required before the unit is rented or occupied.

How big can a detached ADU be in Montgomery County?

Under ZTA 26-06, an ADU — attached or detached — may be up to 75% of the size of the primary home , replacing the county's earlier caps (the least of 1,200 sq ft, 50% of the home's footprint, or 10% of the lot). Accessory-structure height, lot-coverage, and stormwater limits still apply, so they can further constrain a detached unit.

What is ZTA 26-06 and when does it take effect?

ZTA 26-06 is Montgomery County's zoning text amendment updating its ADU rules to comply with Maryland HB 1466 / SB 891. It raises the ADU size limit to no more than 75% of the primary home (replacing the old 1,200 sq ft / 50% footprint / 10% lot caps), expands eligible zones , excludes ADUs from density calculations in all zones, lowers detached-ADU setbacks to the standard accessory-structure setbacks, and reduces parking requirements. It is expected to take effect on or around October 1, 2026 , the state-mandated deadline.

Do I need a license to rent out my Montgomery County ADU?

Yes. The county requires a rental license from the Department of Housing & Community Affairs (DHCA) before an ADU is rented or occupied, and the owner must occupy either the main home or the ADU as a primary residence. Do I need a Class 3 license before I build an ADU in Montgomery County? Yes — the process starts before construction. You file the Class 3 application with DHCA first; construction can't begin until DHCA completes its preliminary inspection report, and the license itself is issued after a final inspection. It's required whether or not you rent the ADU.

Do I need the license if the ADU is for family, not a rental?

Yes. Montgomery County requires the Class 3 license whether the ADU is rented or not — aging-in-place and multigenerational living included. Short-term rentals and Airbnb are not permitted.

How much does the Class 3 ADU license cost?

$615 at submission — a $260 filing fee, a $230 public-notice sign fee, and a $125 annual license fee. Properties in the City of Takoma Park pay $490, since the rental license there is handled by the city.

What are the setback rules for a detached ADU in Montgomery County?

Under ZTA 26-06, effective on or around October 1, 2026, a detached ADU must meet the same side and rear setbacks as any other accessory structure . This replaces the county's earlier rule, which required a 12-foot rear setback plus an added setback for units wider than 24 feet.

What are the ADU setbacks for my zone in Montgomery County?

A detached ADU uses the accessory-structure side and rear setbacks for its zone. In the most common ADU zones that is roughly: RE-2 / RE-1 — 15 ft side, 10 ft rear; R-200 — 12 ft side, 7 ft rear; and R-90, R-60, and R-40 — 5 ft side and 5 ft rear. Corner lots, older recorded lots, and larger structures can change what applies — check your exact standards on Montgomery Planning's zoning fact sheets or with DPS.

Do I need extra parking for an ADU in Montgomery County?

Parking requirements are being reduced under ZTA 26-06 to comply with state law. Under the prior rule, an additional off-street space was required, though it was waived within one mile of a Metro, Purple Line, or MARC station. Confirm the current requirement for your address with DPS.

Do ADUs need fire sprinklers, and what about historic districts?

Newly built detached ADUs generally require fire sprinklers. Properties within a designated historic district also need a Historic Area Work Permit (HAWP) and design review, which adds time to the permitting schedule.

How much does a Montgomery County ADU cost, and how long does it take?

A turnkey one-bedroom / one-bathroom detached ADU typically runs from about $250,000 to $350,000 depending on size, site, and finishes; basement and garage conversions cost less. A Makara ADU can be move-in ready in as little as 120 days from permit approval.

Free Assessment

Is Your Montgomery County Property Eligible for an ADU?

Use our free eligibility checker to find out in about a minute, and get a personalized report sent to your inbox.